SandyI: James2708:Applied via uswitch on 2.3.2009. After calling them they gave gas and electric dates for changeover of 4th and 6th May. Understood this to be the smart meter installation. No new meters installed ( they are external ) so called again. This is the changeover dates I am told. They can now arrange a contact date for smart meters they say.
Good luck with getting a date for the meters! Are they still quoting a "guideline" of installing them within 30 days of the changeover? I am on 135 days and counting..... Actually they did do the gas meter, but it doesn't help because it needs the electric one to send in the data.
I signed up 9 3 2009 Both meters installed 1 7 2009 now connected and working fine,if you are still not connected email stacey.roberts she is at first utility .com very,very helpful Kevin